FIG. 2.
(a) An IMRT process tree, (b) magnified view of the initial treatment planning directive branch. The red numbers indicate (hazard ranking) the most hazardous 20%–25% of the steps as indicated by high risk priority number values. Steps with high severity hazards are shown in green. [See text and Sec. VIII (Ref. 64) for details.] A hazard is something that can cause harm. A risk is the chance, high or low, that any hazard will actually cause somebody harm.
